Marine Corps 29 Palms - Exterior Polyurethane Foam




Sector: Government
Service: HVAC, General Construction
Client: NAVFAC Southwest
Location: Twentynine Palms, CA
Year Completed: 2024
Contracted Amount: $680,000
Overview: Paradigm applied a two-inch (2") spray foam insulation system to the exterior of prefabricated metal structures on base, enhancing thermal performance and weather resistance.
The scope included comprehensive building preparation—removal of doors, conduit, and lighting, as well as the enclosure of all vents and skylights — to ensure a clean and continuous application. The spray foam system consisted of a full two-component process, including surface preparation, primer application, and a protective finish coat.
In conjunction with the insulation work, Paradigm performed metal building repairs, installed new metal trim, and replaced both man doors and roll-up doors to complete the building envelope upgrade.