IRPS Air Handlers

Categories: Education, HVAC, Occupied Facility

  • Client: University of California San Diego

  • Location: La Jolla, CA

  • Year Completed: 2020

  • Budget: $540,000

  • Overview: Replace three (3) air handling units (AH2 through AH4) and associated relief air (RA) fans, piping trim, and control valves. Combine each AH and RA system into a single unit with integral power exhaust and provide a new DDC system at Robinson Complex (IRPS), located on the main campus of the University of California San Diego.

Previous
Previous

Naval Base Pt. Loma, B300 And B601 Hot Water Storage Tank Replacements

Next
Next

Repair Evaporative Coolers, Auto Hobby Shop