Our Paradigm team replaced nine old box car units, a boiler system and various miscellaneous air conditioning units with new McQuay state-of-the-art energy efficient units. The new units incorporated humidity control and included an updated building management control system. New gas and electrical metering systems allow the owner to track each tenant’s usage and associated costs and bill these utilities back to the tenant.

This project required an effective management and coordination of performance of multiple disciplines in an existing and operational facility without disrupting the daily operations. Paradigm’s Quality Control & Safety programs were also effective tools in keeping to the owner’s & project’s commitments while maintaining safe work conditions for both occupants and workers.

Pedestrian walkways and traffic control ensured that the public access to the park was maintained at all times.